Transient simulation during gas pipeline design saves on later costs.
Pipeline & Gas Journal › Vol. 235 Nbr. 1, January 2008
Linked as:
Pipeline & Gas Journal › Vol. 235 Nbr. 1, January 2008
Linked as:Extract
Transient simulation during gas pipeline design saves on later costs.
Transient analysis during design of the Bolivia-to-Brazil gas transmission pipeline helped save money. The transient analysis was performed with heat exchanging between pipeline and soil and keeping the set point of the compressor station after cooler discharge gas temperature at 125 degrees E Transient analysis is a requirement. Steady-state-only analysis, on the other hand, may introduce risk to the project development and prompt unplanned additional investment, causing negative ef...
See the full content of this document
Sponsored links
ver las páginas en versión mobile | web
ver las páginas en versión mobile | web
© Copyright 2012, vLex. All Rights Reserved.
Contents in vLex United States
Explore vLex
For Professionals
For Partners
Company
Other documents:
Meeting the Challenges of 2004 With Determination and Creativity Life Challenge Federal Legislatio Senate Remains Major Obstacle Following Pro-Life Win ... | Paychex Named One of Best Managed Companies in America Forbes Ranked Businesses in 26 Industries Paychex No 1 in Business Services. | Cinema Ride Inc to File its 10K Late. | Barbara Tulipane Named President and Chief Operating Officer of the Electronic Retailing Association. | Decisión nº OH03-S-2004-000171 de Juzgado Primero de Primera Instancia de Mediación y Sustanciación de Protección de Niños Niñas y Adolesce... | Decisión nº 255 de Juzgado Superior Agrario de Zulia de June 17 2009 | Decisión de Tribunal Undécimo de Primera Instancia en Funciones de Control de Lara (Extensión Carora), de February 25, 2009 | decisión de juzgado segundo de primera instancia en función de control audiencias y medidas c...