Determining The Effects On Pipelines Built In Electric Transmission ROW.
A major concern for the pipeline operator is determining how to test, monitor and maintain pipelines built in a power company's transmission right-of-way (ROW). In addition, there are a number of safety precautions that should be adhered to whenever tests are being conducted in a joint facility.
To lower electrical interference effects to pipelines inclose proximity to electric transmission circuits, the primary method is by reducing the pipeline resistance to earth. This is accomplished with electrical interference mitigation systems installed at areas of peak AC or DC voltages along the pipeline. In addition, in order to maintain safety under fault conditions, gradient control mats are installed at abo...See the full content of this document
Sponsored links
ver las páginas en versión mobile | web
ver las páginas en versión mobile | web
© Copyright 2012, vLex. All Rights Reserved.
Contents in vLex United States
Explore vLex
For Professionals
For Partners
Company
Other documents:
Go! Calendar | Bucolic Bliss Blesses Oak Glen Area | Sb Council Votes to Ok Dhl Facility | firefighters to the rescue | sentencia nº 4616 de consiglio di stato, august 28, 2008 | Decreto 393 - NOMBRA MINISTRO PRESIDENTE DEL CONSEJO NACIONAL DE LA CULTURA Y LAS ARTES | arrêtés du 7 novembre 1997 portant affectation (administrateurs civils) | Sentencia nº 472 de Consiglio di Stato January 28 2010